Farbon Wall Light White Metal Brass Matt Rocket Switch - FARBON WBS-WH
by Telbix
| SKU : 0019-FARBON WBS-WH
Sold out
Original price
$115.00
Original price
$115.00
-
Original price
$115.00
Original price
$115.00
Current price
$99.95
$99.95
-
$99.95
Current price
$99.95
Leaves warehouse in 4-5 business days
Product Description
- The FARBON wall lamp is a great portrait of mid-century modernist style.
- The subtle curves and clean lines reflect the informal hip and trendy classic style.
- Presented in black or white with a brass matt flexi-arm for the control of directional light.
Technical Details:
- Operation Voltage: 240V
- Globe Base: E27 / ES
- Wattage: 25W
- IP Rating: IP20
- Globe(s) Included: No
- Shade Shape: Cone
- Usage: Indoor
Dimensions:
- Width: 200 mm
- Hieght: 150 mm
- Projection: 370 mm
- Canopy Projection: 25 mm
Brand & Design:
- Brand: Telbix
- Collection: Farbon
- SKU: FARBON WBS-WH
- Material: Metal
- Colour: White, Brass Matt
- Shade Material: Metal
- Shade Colour: White
Warranty:
- 3-year replacement warranty
This fitting must be installed by a licensed electrician.